Recommended RFIs are kept separate from estimator review items — not every uncertainty becomes an RFI. In the product these are editable — copy, revise, mark resolved, add notes — tied to the finding each one came from. This preview is static, so they are shown read-only.
Recommended RFIs
- RFI 1Steel/iron substrates are named in the 099123 Summary but have no scheduled system — is painting of ferrous items in this scope, and under which system? (099123-1 vs 099123-4)RECOMMENDED RFI
- RFI 2Who finishes architectural woodwork installed on site — the woodwork supplier (shop finish per 064023) or the painting contractor — and where does 099123/099300 scope end?RECOMMENDED RFI
Estimator review items
Checked internally first — not sent as RFIs yet.
- Item 3Appendix A (AIA A101-2007, AIA A201-2007, AIA A701-2018) and any addenda were not provided.Missing supporting documents — request them through the bid process before raising an RFI.ESTIMATOR REVIEW
- Item 4Drawings were not provided; numerous requirements are stated only "as indicated."Missing supporting documents — obtain drawings first; many apparent gaps will resolve against them.ESTIMATOR REVIEW
- Item 5Is any exterior painting/finishing in scope? (099300 exterior-wood moisture clause.)Possible boilerplate — confirm applicability internally before submitting an RFI.ESTIMATOR REVIEW
- Item 6What painting workmanship warranty term applies?Likely answered by Appendix A / AIA A201 general conditions — check internally once obtained.ESTIMATOR REVIEW