Needs my attention
- Documents received1
- Referenced documents missing3
- Unreadable documents / pages0
- Coverage risks4
- Technical bid risks4
- Cost-impact items5
Estimator actions before bid
- 1Obtain Appendix A — AIA A101-2007, AIA A201-2007, AIA A701-2018 (55 pp listed in the TOC, absent from the submitted file).
- 2Obtain drawings — requirements are stated "as indicated" / "on the drawings" throughout Division 09.
- 3Confirm whether addenda were issued; obtain copies.
- 4Submit RFI: coating system for the "Steel and iron" substrates (none is scheduled).
- 5Submit RFI: who finishes architectural woodwork after installation (shop finish vs field scope boundary).
- 6Field-verify the existing stain/finish to be matched before pricing.
- 7Confirm the painting workmanship warranty term (none stated in Division 09; framework is in AIA A201 — not provided).
Analysis status
- Current version
- v2
- Report status
- REPORT READY
- Pages analyzed
- 90
- Last updated
- 2026-09-22
Document coverage
- Documents available1
- Referenced but missing3
- Retrieval issues0
- Unreadable0
- Possible revised documents0
Missing documents
- Drawings
- Appendix A — Supplemental Contract Documents: AIA A101-2007 (8 pp.), AIA A201-2007 (37 pp.), AIA A701-2018 (9 pp.)
- Addenda